Drilling work for Eastwood Global Plaza
Eastwood Global Plaza is a modern 49-storey luxurious condominium built in accordance with the Leadership in Energy and Environmental Design (LEED) requirements, situated alongside towering buildings. Bauer Philippines carried out the design and construction of shoring works and 280 m capping beam for the 4-storey basement excavation pit. A total of 386 piles with a diameter of 880 mm up to a length of 24 m were installed and the resulting secant pile wall was back anchored with about 836 ground anchors with up to 25 strands each. Double wall casings were used to ensure that pile shaft will have minimal bulking and Drilling Inclination System (DIS) was used for monitoring the verticality of casings. With the performance of BG 40 and BG 30 drilling rigs, our experts completed the project 21 days ahead of its contractual schedule.
BAUER Foundations Philippines, Inc.
Quezon City, Metro Manila, Philippines
Eastwood Global Plaza
May 2015 to May 2016
Drilling work
Foundation for modern luxury
Are you starting a project?
Get in touch with us.
12th Floor Units A-K, Cyber One Building
11 Eastwood Avenue
Eastwood City Cyberpark
Bagumbayan Quezon City 1110 Metro Manila