References
Have you ever wondered how great projects become reality? Then you've come to the right place. Because we are building the world of tomorrow. Discover our success stories, innovations and the result of outstanding collaboration. Our projects inspire and reflect our passion for excellence. Find out how we turn our customers' visions into reality and deliver top performance in the process. Your next success story could start now!
Explore the 500-kV transmission line project enhancing Metro Manila's grid with 230 steel towers. ensuring reliable future power connections.
Bauer Philippines led the construction of Quezon City's NovaBala Aqueduct 4 with TBM tunneling and precise piling, enhancing the regions water capacity.
Bauer Philippines successfully carried out the Surface Hole Drilling and Conductor Casing Setting for the Leyte Geothermal Production Fields.
Bauer Philippines carried out foundation work for the new Metro Manila Skyway - without disrupting ongoing traffic.
Bauer Philippines executed foundation works for Velaris Residences at Bridgetown, including Mixed-in-Place-Walls, bulk excavation and 343 bored piles.
Bauer Philippines improved the Zapote LRT Depot with 33,683 lm of Mixed-in-Place-columns, ensuring stable soil conditions for the LRT Line-1 extension.
Bauer Philippines enhanced the Cebu Integrated Resort with Mixed-in-Place-walls and stone columns, ensuring stability and protection against seismic risks.
Bauer Philippines carried out drilling work for the Mak-Ban geothermal field, ensuring successful energy production in Laguna and Batangas.
Bauer Philippines carries out foundation work for the 30-storey building complex Seaview City on Manila Bay.
MICT, the Philippines' largest container terminal, was upgraded by Bauer Philippines through soil improvement work using Vibro compaction, ensuring quality and stability.
Bauer Philippines drilled two 36.5 m wells at Tiwi Geothermal Field, ensuring long-term steam supply for power plants in Albay.
Bauer Philippines enhances the Metro Manila Skyway by installing 65 onshore and 74 offshore bored piles for the San Juan River Viaduct.