NovaBala Aqueduct 4
In Quezon City, one of the Philippine’s largest water supply infrastructures is being constructed. With 7.3 km and 3.1 diameter tunnels and underground aqueduct will be capable of conveying 1000 million liters per day. The NovaBala Aqueduct 4 (NBAQ4) is Metro manila’s first tunnel built using a tunnel boring machine (TBM). Bauer Philippines was commissioned with designing and constructing the TBM launch shaft using a Secant Pile Wall with 22 primary pikes and 22 secondary piles to a depth of 47 m. Our experts also completed capping beams and bulk excavation. For the outlet shaft, Bauer Philippines installed 20 primary piles and 20 secondary piles to 29 m depth. Using a BG 40 and a drilling inclination system (DIS) on all piles, the specialists made sure to measure the verticality and ensure that each pile is withing the design tolerance.
BAUER Foundations Philippines, Inc.
Quezon City, Metro Manila, Philippines
NovaBala Aqueduct 4
Februar to March 2022
Secant pile wall
NBAQ4
Are you starting a project?
Get in touch with us.
12th Floor Units A-K, Cyber One Building
11 Eastwood Avenue
Eastwood City Cyberpark
Bagumbayan Quezon City 1110 Metro Manila