Vibro compaction for MICT Berth
Manila International Container Terminal (MICT) is one of the three terminals in the Port of Manila (the core of the country's port system) and is known to be the largest and most modern container terminal in the Philippines. As part of the MICT upgrade, Bauer Philippines was contracted for the soil improvement works in the Southern Wharf Extension and Northern Yard Development. Bauer was awarded with the design and construction of soil improvement works for the 3,025 square meters reclaimed area, done through Vibro compaction consisting of 1014 points from elevation +4.3 m to elevation -18.8 m, and 616 points from elevation +2.2 m to elevation -10.5 m. Quality measures such as application of b-tronic software ensured that the construction procedure follows the project specifications and standard requirements. Cone Penetration Tests by Third Party Tester were also done to verify the efficiency of compaction.
BAUER Foundations Philippines, Inc.
Manila, Philippines
MICT Berth
April 2019 to February 2020
Vibro compaction
Manila International Container Terminal Berth
Are you starting a project?
Get in touch with us.
12th Floor Units A-K, Cyber One Building
11 Eastwood Avenue
Eastwood City Cyberpark
Bagumbayan Quezon City 1110 Metro Manila